ALTA MEDIA ELEVATES “K-STAR SPARK IN VIETNAM – MEGA CONCERT 2025” WITH IMMERSIVE LED DISPLAY AND BARCO CONTROL SYSTEM
On the night of June 21, 2025, My Dinh National Stadium ignited in a whirlwind of music and next-generation visuals as the “K-Star Spark in Vietnam – Mega Concert 2025” officially took center stage. With over 40,000 fans in attendance and a star-studded lineup including G-Dragon, CL, DPR IAN, TEMPEST, and tripleS, the event transcended the boundaries of a traditional concert—becoming a standout cultural and technological milestone of the year. As the official visual solution provider, Alta Media proudly delivered a comprehensive display system—from massive LED installations to an advanced image processing platform—crafting a stage that was not only dynamic but also infused with artistic and technological brilliance.

G- Dragon ignites the stage in the rain, backed by dazzling led visuals
To meet the scale and demanding requirements of the mega concert, Alta Media deployed an expansive LED display system spanning nearly 1,500 square meters—one of the largest outdoor visual installations ever constructed at My Dinh Stadium. The setup featured 974 m² of Transparent LED P3.91–7.82, 398 m² of P3 outdoor LED, and 80 m² of P4 outdoor LED.
This diverse range of screen types was meticulously configured to meet varying needs in size, positioning, and lighting, while also enhancing spatial depth and delivering striking visual effects throughout the performances. Notably, despite prolonged heavy rain during the concert, the entire LED system operated flawlessly without interruption—demonstrating Alta Media’s exceptional equipment durability, weather resistance, and dependable waterproof performance in real-world outdoor conditions.

Barco E2 GEN2 system and disguise GX 3 power a next-level visual ecosystem at “K-star spark in VietNam - Mega concert 2025”
Beyond the massive LED hardware, Alta Media engineered a cutting-edge visual ecosystem by integrating the real-time graphics server Disguise GX 3, the Barco E2 Gen2 video processor, and the EC-210 controller. At the core, Disguise GX 3 served as the real-time content engine—responsible for rendering and processing interactive visuals, 3D mapping, XR elements, and advanced Notch layers. From the GX 3, visual signals were routed to the Barco E2 Gen2, where content was processed, layered, synchronized, and mapped precisely to each LED zone at the correct resolution. This setup enabled multiple content layers to display simultaneously with seamless transitions and zero latency, ensuring perfect synchronization between visuals and audio throughout every performance.
The EC-210 functioned as the central control interface, empowering Alta Media’s on-site technicians to make rapid layout changes, switch presets, and respond instantly to live cues or unexpected changes. With pre-programmable controls aligned with the stage timeline, the EC-210 allowed for proactive, accurate, real-time system operation—an essential capability for long-duration events involving tens of thousands of attendees and complex technical sequences like this mega concert.

The integration of diverse LED technologies with Disguise GX 3, Barco E2 Gen2, and the EC-210 controller created a comprehensive visual platform—covering every stage from content design and signal processing to final display output. This system enabled fluid delivery of dynamic lighting effects, real-time overlays, AR visuals, and motion-based mapping, making performances like G-Dragon’s rain-drenched set not only visually stunning but also deeply emotive. This is where Alta Media stands apart: technology is not just a tool—it becomes the catalyst that elevates live entertainment into artistic expression.
Alta Media’s commitment extended beyond the primary display system to include a meticulously designed on-site monitoring setup. At the FOH (Front of House) control desk, 14 twenty-four-inch monitors were installed to track input/output signals, content layers, and device connectivity across the entire system. Meanwhile, around the stage and backstage areas, 8 thirty-two-inch and 4 forty-nine-inch monitors were positioned to support directors, lighting and sound engineers, and performers—helping them follow cue progressions, visual effects, and transition points in real time. This seamless coordination between the monitoring infrastructure and the live display system ensured pinpoint accuracy for every sequence, eliminating discrepancies or delays at any stage of the production.

The resounding success of the “K-Star Spark in Vietnam – Mega Concert 2025” once again reaffirmed Alta Media’s capabilities, experience, and technological vision in the field of large-scale event displays. As a strategic partner in visual technology, Alta Media not only delivered robust technical execution but also contributed to the show’s artistic quality and immersive audience experience. From system design to live operations, Alta Media demonstrated how the synergy between advanced technology and skilled professionals can create unforgettable moments.
Backed by state-of-the-art equipment, a creative mindset, and a highly skilled technical team, Alta Media remains committed to supporting premier festivals, concerts, exhibitions, and artistic productions across Vietnam and beyond. Wherever Alta Media is present, stages are not only illuminated by LED lights—but elevated by cutting-edge solutions, built to meet any challenge and leave a lasting impression on every audience.
ALTA MEDIA – PROFESSIONAL LED SCREEN RENTAL PROVIDER
For consultation and the best pricing, please contact us directly via the details below:
Mr. Tài Hoàng: +84 933 802 408
Ms. Khuê Trần: +84 902 468 830
Address: 86/33 Âu Cơ Street, Ward 9, Tân Bình District (enter through alley 220/54/8 Âu Cơ)